top of page
Winchester Sport and Leisure Park
Architect:
Main Contractor:
Global Ceramics and TRI Contracting
Project Value:
L.A Architects
Willmott Dixon
Tiling Subcontractor:
£38m

Spec Tile provided the technical tiling package at the Winchester Sport and Leisure Park, areas covered included the 50 metre eight-lane swimming pool, 20m teaching pool, wet and dry change areas and circulation.

Gallery
Location
bottom of page










