top of page
Manchester Aquatics Centre
Architect:
Main Contractor:
Plunkett Tiling
Project Value:
Pozzoni
Kier
Tiling Subcontractor:
£31m

The Manchester Aquatics Centre was built to host the Commonwealth Games in 2002 and Spec Tile supplied the original tiling package. In 2021 the centre closed for refurbishment and Spec Tile were approached to help create a fresh, technical tiling package.

Gallery
Location
bottom of page














