+44 (0)1270 256666 sales@spectile.co.uk

The Centre, Slough

27
Mar
Architect:  GT3 Architects
Contractor:  Morgan Sindall
Areas Supplied:  Pool surround floors and walls. Shower areas
Completed:  2019

Slough’s brand-new The Centre opened its doors on 25th March. The centre represents a huge step forward for leisure provisions in the town. Among many features to enjoy at The Centre, there’s a huge 115 station gym, an eight-lane, 25-metre swimming pool and a versatile four-court sports hall.

The new centre also features three group fitness studios a smaller teaching pool with movable floor, a sauna and steam room, two spa treatment rooms and café. Spectile worked closely alongside GT3 Architects to specify the correct floor and wall tile types to the centre.

IMG_8810 SML